Case study for product family replacement strategies based on dynamic programming

Jia Luo*, Lan Jiang, Nai Ren Zhang, Yang Zhang, Nai Lin, Jian Ping Lu

*此作品的通讯作者

科研成果: 期刊稿件文章同行评审

摘要

A case study of water dispensers is reported to explain a systematic methodology based on dynamics programming (DP), which is proposed to plan the launch timing of new modules that will replace the existing modules of an evolving product family (PF) architecture. The DP-based methodology proposed breaks up the PF module launch planning optimization problem into smaller DP optimization problems involving module groups based on the independence assumption of profit change due to module replacement strategies. The aggregation concepts of independent module groups and module clusters are used to decrease the state space and the calculation space in the DP model. The proposed methodology seeks to maximize the total profit of a PF for a given planning horizon by taking into account the interdependencies of modules at both the product level and the PF level. The case study of water dispensers PF demonstrates the effectiveness of the proposed methodology.

源语言英语
页(从-至)319-323
页数5
期刊Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology
28
4
出版状态已出版 - 4月 2008

指纹

探究 'Case study for product family replacement strategies based on dynamic programming' 的科研主题。它们共同构成独一无二的指纹。

引用此