A Fuzzy Scheduling Strategy for Online Multi-workflows in IaaS Clouds

Lingjuan Ye, Yuanqing Xia*, Liwen Yang, Chu Ge Wu, Yufeng Zhan

*Corresponding author for this work

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

2 Citations (Scopus)

Abstract

With the development of cloud computing, more and more complex workflows have been migrated to clouds and executed with cloud resources. In clouds, it is a a challenging issue to minimize workflow execution cost for scheduling workflow with the deadline constraint. Existing studies are mainly done subject to rigorous conditions without fluctuations, ignoring the fact that workflow scheduling is typically present in uncertain environment. In this paper, we propose a workflow fuzzy scheduling algorithm (WFSA) which aims to minimize workflow scheduling cost and satisfy deadline constraints. In WFSA, we adopt the triangular fuzzy numbers (TFNs) to represent the task processing time and rank tasks to form a scheduling order by the fuzzy sorting strategy. A fuzzy deadline assignment method based on partial critical path (PCPs) of workflows is designed to decomposes the workflow deadline constraint into tasks sub-deadline constraints. A cost-driven fuzzy scheduling strategy is proposed to heuristically select virtual machines (VMs) for minimizing workflow scheduling cost and meeting the task sub-deadline constraint. The experimental results show that our algorithm can effectively reduce the workflow execution cost, compared with other benchmark solutions.

Original languageEnglish
Title of host publicationProceedings of the 41st Chinese Control Conference, CCC 2022
EditorsZhijun Li, Jian Sun
PublisherIEEE Computer Society
Pages2428-2433
Number of pages6
ISBN (Electronic)9789887581536
DOIs
Publication statusPublished - 2022
Event41st Chinese Control Conference, CCC 2022 - Hefei, China
Duration: 25 Jul 202227 Jul 2022

Publication series

NameChinese Control Conference, CCC
Volume2022-July
ISSN (Print)1934-1768
ISSN (Electronic)2161-2927

Conference

Conference41st Chinese Control Conference, CCC 2022
Country/TerritoryChina
CityHefei
Period25/07/2227/07/22

Keywords

  • Cloud computing
  • Deadline constraint
  • Fuzzy processing time
  • Workflow scheduling

Fingerprint

Dive into the research topics of 'A Fuzzy Scheduling Strategy for Online Multi-workflows in IaaS Clouds'. Together they form a unique fingerprint.

Cite this