TY - GEN
T1 - An analysis of game of electricity trade in electricity power market
AU - Wang, Honglei
AU - Wei, Yiming
PY - 2007
Y1 - 2007
N2 - Competition has been introduced into electricity power area by electricity industry, style of generating and transmitting electricity converts from vertical unity distribution to commercial exchange. In the game with power_generating corporation, power grid corporation should not only make its rivals to reduce generating cost to increase consumer surplus but also encourage them to raise electricity investment so that supply duty is insured, thus, setting up appropriate time of contract electricity is as important as establishment of electricity price. During which time, electricity power corporation should be able to recover its investment, also, the time should not be so long that present corporation can form market power by expanding manufacturing ability with the long-time tract; we set up a model of game of the regional market business transactions between power grid corporation and electricity power corporation and make an analysis; method of iteration is used to calculate appropriate contract time for investment recovering of Anshun and Tianshengqiao power stations. The Anshun station is building a new station and expanding its old one, while the later is building a new station. We have uses algorithms to calculate and examine the model of game.
AB - Competition has been introduced into electricity power area by electricity industry, style of generating and transmitting electricity converts from vertical unity distribution to commercial exchange. In the game with power_generating corporation, power grid corporation should not only make its rivals to reduce generating cost to increase consumer surplus but also encourage them to raise electricity investment so that supply duty is insured, thus, setting up appropriate time of contract electricity is as important as establishment of electricity price. During which time, electricity power corporation should be able to recover its investment, also, the time should not be so long that present corporation can form market power by expanding manufacturing ability with the long-time tract; we set up a model of game of the regional market business transactions between power grid corporation and electricity power corporation and make an analysis; method of iteration is used to calculate appropriate contract time for investment recovering of Anshun and Tianshengqiao power stations. The Anshun station is building a new station and expanding its old one, while the later is building a new station. We have uses algorithms to calculate and examine the model of game.
KW - Contract time
KW - Electricity power market
KW - Electricity trade
KW - Game
UR - http://www.scopus.com/inward/record.url?scp=37749023988&partnerID=8YFLogxK
U2 - 10.1109/CHICC.2006.4346827
DO - 10.1109/CHICC.2006.4346827
M3 - Conference contribution
AN - SCOPUS:37749023988
SN - 7900719229
SN - 9787900719225
T3 - Proceedings of the 26th Chinese Control Conference, CCC 2007
SP - 133
EP - 137
BT - Proceedings of the 26th Chinese Control Conference, CCC 2007
T2 - 26th Chinese Control Conference, CCC 2007
Y2 - 26 July 2007 through 31 July 2007
ER -