Time delay analysis of turbo code decoding algorithms

Ning Mao*, Jing Ming Kuang, Jia Kang Liu

*此作品的通讯作者

科研成果: 期刊稿件文章同行评审

摘要

Through a comparison of the MAP and SOVA algorithms of the Turbo code and an analysis on the SOVA algorithm, some improvements upon its time delay in Turbo code decoding were arrived at and measures for solving the problem were discussed. Through computer simulation, the paper presents some useful conclusions. Simulation results show that the improvements are effective.

源语言英语
页(从-至)105-108
页数4
期刊Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology
23
1
出版状态已出版 - 2月 2003

指纹

探究 'Time delay analysis of turbo code decoding algorithms' 的科研主题。它们共同构成独一无二的指纹。

引用此

Mao, N., Kuang, J. M., & Liu, J. K. (2003). Time delay analysis of turbo code decoding algorithms. Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology, 23(1), 105-108.