Supply coordination with penalty policy in the assembly system under uncertain delivery time

Guo Li*, Tao Gao, Zhaohua Wang, Shihua Ma

*此作品的通讯作者

    科研成果: 期刊稿件文章同行评审

    2 引用 (Scopus)

    摘要

    Successful supply chain management requires a cooperative integration between all the partners. We study an assembly system with two suppliers and one manufacturer under uncertain delivery time. The model is established and optimal solution is given under decentralized decision. We find the cost function of two suppliers is convex, and there exists the unique Nash equilibrium between the two suppliers. Then the optimal decision under centralized decision is analyzed, which is regarded as a benchmark for supply coordination. Additionally, the total cost of the assembly system is jointly convex in agreed delivery times. To achieve supply coordination we develop a penalty policy to coordinate the assembly system under uncertain delivery time. Finally we provide numerical and sensitivity analysis and the result show our penalty policy is reasonable and effective.

    源语言英语
    页(从-至)323-331
    页数9
    期刊Advances in Information Sciences and Service Sciences
    3
    10
    DOI
    出版状态已出版 - 11月 2011

    指纹

    探究 'Supply coordination with penalty policy in the assembly system under uncertain delivery time' 的科研主题。它们共同构成独一无二的指纹。

    引用此