Progressive Order Insertion Dynamic Scheduling Method Considering Production Capacity

Jiahuan Huang, Aimin Wang*, Tao Ding

*此作品的通讯作者

科研成果: 书/报告/会议事项章节会议稿件同行评审

摘要

In the process of flexible manufacturing cells, the disturbance of single insertion will cause a delay of existing production orders. In this paper, a scheduling model is established to minimize order delay and maximum order completion time for the rescheduling problem of a flexible job shop. Design a progressive order insertion rearrangement strategy, and set the buffer time for inserting orders. Determine the start time of rescheduling by buffer time. In terms of algorithm, NEH heuristic scheduling is improved according to the characteristics of the model. Design the initial sequence generation rule index factor. Use algorithms to solve the model. The simulation results show that the progressive order insertion rearrangement strategy can effectively reduce the order delay compared with the complete rescheduling, which verifies the feasibility and effectiveness of the proposed method.

源语言英语
主期刊名Proceedings - 2022 3rd International Conference on Computer Science and Management Technology, ICCSMT 2022
出版商Institute of Electrical and Electronics Engineers Inc.
512-515
页数4
ISBN(电子版)9798350320404
DOI
出版状态已出版 - 2022
活动3rd International Conference on Computer Science and Management Technology, ICCSMT 2022 - Shanghai, 中国
期限: 18 11月 202220 11月 2022

出版系列

姓名Proceedings - 2022 3rd International Conference on Computer Science and Management Technology, ICCSMT 2022

会议

会议3rd International Conference on Computer Science and Management Technology, ICCSMT 2022
国家/地区中国
Shanghai
时期18/11/2220/11/22

指纹

探究 'Progressive Order Insertion Dynamic Scheduling Method Considering Production Capacity' 的科研主题。它们共同构成独一无二的指纹。

引用此