摘要
To design a time delay auxiliary analysis system for array signal time delay estimation, a data acquisition system with eight channels is designed and signal acquisition experiment is carried out. A virtual instrument is selected as development tool for the analysis system design. The models included in the analysis system are waveform playback, spectrum analysis, filtering analysis and time delay analysis. Spectrum analysis and time delay estimation of the signal have been carried out with the system, and curve of the time delay vs. time is given. Research result reveals that the system is helpful in the research of time delay estimation.
源语言 | 英语 |
---|---|
页(从-至) | 56-59 |
页数 | 4 |
期刊 | Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology |
卷 | 34 |
期 | 1 |
出版状态 | 已出版 - 1月 2014 |
指纹
探究 'Design of an array signal time delay analysis system' 的科研主题。它们共同构成独一无二的指纹。引用此
Li, M., Yuan, Z., Jiang, C. L., & Wang, Z. C. (2014). Design of an array signal time delay analysis system. Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology, 34(1), 56-59.