Linear rail space dynamic scheduling technology for multi- tasking hybrid assembly sections

Zhi Bing Lu, Ai Min Wang, Cheng Tong Tang, Jing Sheng Li

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

For the rapid response to production scheduling problem driven by high-density production tasks, a dynamic scheduling technology for the large precision strip products assembly with a mixture of task time nodes and line-rail space is proposed. A scheduling constrained model containing coverage, proximity, timeliness and resource is established. A linear rail space production scheduling technology using heuristic automatic scheduling and event-driven method is put forward. The time rule based on delivery and single completion assembly is formed, at the same time the space rule based on the adjacent rail and comprehensive utilization is researched. Supposing the privilege of single product assembling as the core, the scheduling parts filter method based on multiple constraints and former rules. For the space layout problem, a clingy forward and backward algorithms is proposed to judge the assemble position regarding the space comprehensive utilization rate. The classification of the various disturbances in the actual production is summarized. Three basic algorithms are proposed, including insertion, moving and re-scheduling algorithm, in order to solve the assembly dynamic scheduling problem driven by production disturbance events. Finally, take rocket as the example the rocket assembly space production scheduling system is developed, combining with the proposed algorithm. The practicability of the system is validated using real data.

Original languageEnglish
Title of host publicationFrontiers of Manufacturing and Design Science III
Pages650-656
Number of pages7
EditionPART 1
DOIs
Publication statusPublished - 2013
Event3rd International Conference on Frontiers of Manufacturing and Design Science, ICFMD 2012 - , Hong Kong
Duration: 11 Dec 201213 Dec 2012

Publication series

NameApplied Mechanics and Materials
NumberPART 1
Volume271
ISSN (Print)1660-9336
ISSN (Electronic)1662-7482

Conference

Conference3rd International Conference on Frontiers of Manufacturing and Design Science, ICFMD 2012
Country/TerritoryHong Kong
Period11/12/1213/12/12

Keywords

  • Completion assembly coordination algorithm
  • Dynamic scheduling
  • Heuristic rules
  • Linear rail space production scheduling
  • Liner space resources scheduling

Fingerprint

Dive into the research topics of 'Linear rail space dynamic scheduling technology for multi- tasking hybrid assembly sections'. Together they form a unique fingerprint.

Cite this