System reliability and maintainability assessment through simulation: A case study of bus dynamic operation in transit networks

Wuhong Wang*, Fuguo Hou, Zhongjie Shen, Katsushi Ikeuchi

*此作品的通讯作者

科研成果: 会议稿件论文同行评审

1 引用 (Scopus)

摘要

The dependability assessment (i.e., reliability, maintainability) to bus dynamic operation in transit networks is playing increasingly important role in designing routes, creating timetables, scheduling bus to trips and assigning drivers. Since failures and repairs can occur at any time and even simultaneously during the bus operation process, in-operate repair or replacement that subjects to random times to failure must be made before the maximum bus downtime is exceeded. Also, inoperate maintenance must take into account such factors as time to repair, failure rates, repair rates, and distributions of the preceding factors. In this paper, we have carried out the assessment of bus dynamic operation in special transit networks through simulation as a case study. It is shown that the system dependability assessment method through simulation is powerful and adaptable to measure the reliability and maintainability of bus dynamic operation whose subsystems/components follow to arbitrary failure and repair distributions. The emphasis of this paper is also placed on the presentation of algorithm of dependability simulation and simulation procedures.

源语言英语
421-425
页数5
DOI
出版状态已出版 - 2004
活动Proceedings of the Eighth International Conference on Applications of Advanced Technologies in Transportaion Engineering - Beijing, 中国
期限: 26 5月 200428 5月 2004

会议

会议Proceedings of the Eighth International Conference on Applications of Advanced Technologies in Transportaion Engineering
国家/地区中国
Beijing
时期26/05/0428/05/04

指纹

探究 'System reliability and maintainability assessment through simulation: A case study of bus dynamic operation in transit networks' 的科研主题。它们共同构成独一无二的指纹。

引用此