TY - GEN
T1 - Study on resource scheduling method of predictive maintenance for equipment based on knowledge
AU - Li, Xin
AU - Wen, Jinqian
AU - Zhou, Rui
AU - Hu, Yaoguang
N1 - Publisher Copyright:
© 2015 IEEE.
PY - 2016/1/13
Y1 - 2016/1/13
N2 - At present, heavy industrial competition makes more manufacturing pay attention to the service based on their products. Therefore, product service system has caused the extensive value of the academic circles. Service resource scheduling is the key step in the product service delivery, which depends on the knowledge mined from history service data and product information in the use process, namely the different fault maintenance scheme, technicians' skill, equipment state information, fault prediction information, work plan, etc. Based on this, this paper puts forward a resource scheduling method for predictive maintenance services of equipment whose location change dynamically, aiming at eliminating potential failure, minimizing service cost and outage cost, considering the technicians' ability of different maintenance task, fault prediction information, equipment operation plan and other constraints. First, a mathematical model is set up to describe this problem. Then this paper adopts a hybrid algorithm to resolve that. Last, the result that the best time of servicing, route planning and the reasonable technician, shows this method can improve the service level and reduce total cost.
AB - At present, heavy industrial competition makes more manufacturing pay attention to the service based on their products. Therefore, product service system has caused the extensive value of the academic circles. Service resource scheduling is the key step in the product service delivery, which depends on the knowledge mined from history service data and product information in the use process, namely the different fault maintenance scheme, technicians' skill, equipment state information, fault prediction information, work plan, etc. Based on this, this paper puts forward a resource scheduling method for predictive maintenance services of equipment whose location change dynamically, aiming at eliminating potential failure, minimizing service cost and outage cost, considering the technicians' ability of different maintenance task, fault prediction information, equipment operation plan and other constraints. First, a mathematical model is set up to describe this problem. Then this paper adopts a hybrid algorithm to resolve that. Last, the result that the best time of servicing, route planning and the reasonable technician, shows this method can improve the service level and reduce total cost.
KW - equipment
KW - knowledge
KW - predictive maintenance
KW - resource scheduling
UR - http://www.scopus.com/inward/record.url?scp=84966533782&partnerID=8YFLogxK
U2 - 10.1109/ISKE.2015.13
DO - 10.1109/ISKE.2015.13
M3 - Conference contribution
AN - SCOPUS:84966533782
T3 - Proceedings - The 2015 10th International Conference on Intelligent Systems and Knowledge Engineering, ISKE 2015
SP - 345
EP - 350
BT - Proceedings - The 2015 10th International Conference on Intelligent Systems and Knowledge Engineering, ISKE 2015
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 10th International Conference on Intelligent Systems and Knowledge Engineering, ISKE 2015
Y2 - 24 November 2015 through 27 November 2015
ER -