TY - JOUR
T1 - Simultaneous Scheduling of Processing Machines and Automated Guided Vehicles via a Multi-View Modeling-Based Hybrid Algorithm
AU - Xin, Bin
AU - Lu, Sai
AU - Wang, Qing
AU - Deng, Fang
AU - Shi, Xiang
AU - Cheng, Jun
AU - Kang, Yuhang
N1 - Publisher Copyright:
IEEE
PY - 2023
Y1 - 2023
N2 - The flexible job-shop co-scheduling problem (FJCSP) for processing machines and automated guided vehicles (AGVs) in a flexible manufacturing system (FMS) has attracted more attention with the aim of improving production efficiency. In FMS, AGVs in charge of transporting jobs realize the flexible linkage of operations between different processing machines. The added interdependence between transporting and processing tasks brings more difficulties than the traditional flexible job-shop scheduling problem (FJSP). In this paper, the mathematical model of FJCSP is formulated to minimize the makespan. Considering the feature similarity of FJCSP with FJSP and AGV-routing problem in different cases, a multi-view modeling-based hybrid algorithm consisting of an estimation of distribution algorithm (EDA) and an ant colony optimization (ACO) is proposed. In EDA, a probability model abstracts the information in superior solutions about the operation sequencing and the rule selection for scheduling machines and AGVs. In ACO, a job-path pheromone model and an AGV-path pheromone model are designed to jointly select the job-machine-AGV combination with shorter processing time and transportation time. In the proposed hybrid algorithm, EDA and ACO generate solutions independently and achieve cooperation by sharing elites. An adaptive parameter is designed to regulate the use of the two methods to adapt to the varying demands of multi-view modeling in different cases and search stages. Furthermore, a local search with a three-layer operator based on the critical path method is proposed to balance exploration and exploitation in solution space. Finally, computational experiments involving a case study verified the advantage of the multi-view modeling-based hybrid algorithm in comparison with the state-of-the-art approaches. Note to Practitioners—This paper was motivated by the optimization problem of scheduling machines and automated guided vehicles (AGVs) in flexible manufacturing system (FMS). In FMS with AGVs, the transportation stages for jobs by AGVs significantly impact the overall production efficiency of the FMS and cannot be overlooked. This paper suggested a hybrid evolutionary algorithm using an estimation of distribution algorithm (EDA), an ant colony optimization (ACO) and a local search algorithm based on the critical path method. In the proposed hybrid algorithm, an adaptive parameter is introduced to regulate the utilization of EDA and ACO in generating a new population. This paper presents a mathematical characterization of the scheduling problem and subsequently outlines the step-by-step design of the hybrid algorithm. Computational experiments, including a case study, demonstrate that the hybrid algorithm exhibits adaptability to various instances and outperforms state-of-the-art approaches.
AB - The flexible job-shop co-scheduling problem (FJCSP) for processing machines and automated guided vehicles (AGVs) in a flexible manufacturing system (FMS) has attracted more attention with the aim of improving production efficiency. In FMS, AGVs in charge of transporting jobs realize the flexible linkage of operations between different processing machines. The added interdependence between transporting and processing tasks brings more difficulties than the traditional flexible job-shop scheduling problem (FJSP). In this paper, the mathematical model of FJCSP is formulated to minimize the makespan. Considering the feature similarity of FJCSP with FJSP and AGV-routing problem in different cases, a multi-view modeling-based hybrid algorithm consisting of an estimation of distribution algorithm (EDA) and an ant colony optimization (ACO) is proposed. In EDA, a probability model abstracts the information in superior solutions about the operation sequencing and the rule selection for scheduling machines and AGVs. In ACO, a job-path pheromone model and an AGV-path pheromone model are designed to jointly select the job-machine-AGV combination with shorter processing time and transportation time. In the proposed hybrid algorithm, EDA and ACO generate solutions independently and achieve cooperation by sharing elites. An adaptive parameter is designed to regulate the use of the two methods to adapt to the varying demands of multi-view modeling in different cases and search stages. Furthermore, a local search with a three-layer operator based on the critical path method is proposed to balance exploration and exploitation in solution space. Finally, computational experiments involving a case study verified the advantage of the multi-view modeling-based hybrid algorithm in comparison with the state-of-the-art approaches. Note to Practitioners—This paper was motivated by the optimization problem of scheduling machines and automated guided vehicles (AGVs) in flexible manufacturing system (FMS). In FMS with AGVs, the transportation stages for jobs by AGVs significantly impact the overall production efficiency of the FMS and cannot be overlooked. This paper suggested a hybrid evolutionary algorithm using an estimation of distribution algorithm (EDA), an ant colony optimization (ACO) and a local search algorithm based on the critical path method. In the proposed hybrid algorithm, an adaptive parameter is introduced to regulate the utilization of EDA and ACO in generating a new population. This paper presents a mathematical characterization of the scheduling problem and subsequently outlines the step-by-step design of the hybrid algorithm. Computational experiments, including a case study, demonstrate that the hybrid algorithm exhibits adaptability to various instances and outperforms state-of-the-art approaches.
KW - Adaptation models
KW - Automated guided vehicle
KW - Flexible manufacturing system
KW - Frequency modulation
KW - Genetic algorithms
KW - Job shop scheduling
KW - Modeling-based method
KW - Multi-view
KW - Search problems
KW - Simultaneous scheduling
KW - Task analysis
KW - Transportation
UR - http://www.scopus.com/inward/record.url?scp=85167804808&partnerID=8YFLogxK
U2 - 10.1109/TASE.2023.3301656
DO - 10.1109/TASE.2023.3301656
M3 - Article
AN - SCOPUS:85167804808
SN - 1545-5955
SP - 1
EP - 15
JO - IEEE Transactions on Automation Science and Engineering
JF - IEEE Transactions on Automation Science and Engineering
ER -