TY - GEN
T1 - Research on port project management maturity model
AU - Wang, Junmei
AU - Dong, Peiwu
AU - Qu, Guohua
AU - Zhang, Xuezhou
PY - 2013
Y1 - 2013
N2 - The paper gives the port project management maturity model based on the ability of project construction preparation, schedule control, quality control, investment control, completion approval, comprehensive management process. The data is obtained through questionnaires. The evaluate index system and key practice in each level are described in this paper, and AHP decision analysis method is applied to determine the weight of each index factor in maturity. The practical application to enterprise shows that it could provide a valuable method for Chinese enterprises to implement project management.
AB - The paper gives the port project management maturity model based on the ability of project construction preparation, schedule control, quality control, investment control, completion approval, comprehensive management process. The data is obtained through questionnaires. The evaluate index system and key practice in each level are described in this paper, and AHP decision analysis method is applied to determine the weight of each index factor in maturity. The practical application to enterprise shows that it could provide a valuable method for Chinese enterprises to implement project management.
KW - analytic hierarchy process (AHP)
KW - evaluation index
KW - maturity level
KW - project management maturity model (PM3)
UR - http://www.scopus.com/inward/record.url?scp=84893698064&partnerID=8YFLogxK
U2 - 10.1109/ICIII.2013.6702917
DO - 10.1109/ICIII.2013.6702917
M3 - Conference contribution
AN - SCOPUS:84893698064
SN - 9781479939855
T3 - Proceedings of 2013 6th International Conference on Information Management, Innovation Management and Industrial Engineering, ICIII 2013
SP - 234
EP - 238
BT - Proceedings of 2013 6th International Conference on Information Management, Innovation Management and Industrial Engineering, ICIII 2013
T2 - 2013 6th International Conference on Information Management, Innovation Management and Industrial Engineering, ICIII 2013
Y2 - 23 November 2013 through 24 November 2013
ER -