Research on a Dynamic Task Update Assignment Strategy Based on a “Parts to Picker” Picking System

Kaibo Liang, Li Zhou, Jianglong Yang, Huwei Liu*, Yakun Li, Fengmei Jing, Man Shan, Jin Yang

*此作品的通讯作者

科研成果: 期刊稿件文章同行评审

6 引用 (Scopus)

摘要

Order picking is a crucial operation in the storage industry, with a significant impact on storage efficiency and cost. Responding quickly to customer demands and shortening picking time is crucial given the random nature of order arrival times and quantities. This paper presents a study on the order-picking process in a distribution center, employing a “parts-to-picker” system, based on dynamic order batching and task optimization. Firstly, dynamic arriving orders with uncertain information are transformed into static picking orders with known information. A new method of the hybrid time window is proposed by combining fixed and variable time windows, and an order consolidation batch strategy is established with the aim of minimizing the number of target shelves for picking. A heuristic algorithm is designed to select a shelf selection model, taking into account the constraint condition that the goods on the shelf can meet the demand of the selection list. Subsequently, task division of multi-AGV is carried out on the shelf to be picked, and the matching between the target shelf and the AGVs, as well as the order of the AGVs to complete the task of picking, is determined. A scheduling strategy model is constructed to consider the task completion time as the incorporation of moving time, queuing time, and picking time, with the shortest task completion time as the objective function and AGV task selection as the decision variable. The improved ant colony algorithm is employed to solve the problem. The average response time of the order batching algorithm based on a hybrid time window is 4.87 s, showing an improvement of 22.20% and 40.2% compared to fixed and variable time windows, respectively. The convergence efficiency of the improved ant colony algorithm in AGV task allocation is improved four-fold, with a better convergence effect. By pre-selecting the nearest picking station for the AGVs, the multi-AGV picking system can increase the queuing time. Therefore, optimizing the static picking station selection and dynamically selecting the picking station queue based on the queuing situation are proposed. The Flexsim simulation results show that the queue-waiting and picking completion times are reduced to 34% of the original, thus improving the flexibility of the queuing process and enhancing picking efficiency.

源语言英语
文章编号1684
期刊Mathematics
11
7
DOI
出版状态已出版 - 4月 2023
已对外发布

指纹

探究 'Research on a Dynamic Task Update Assignment Strategy Based on a “Parts to Picker” Picking System' 的科研主题。它们共同构成独一无二的指纹。

引用此