Project scheduling problem for software development with random fuzzy activity duration times

Wei Huang*, Lixin Ding, Bin Wen, Buqing Cao

*此作品的通讯作者

科研成果: 书/报告/会议事项章节会议稿件同行评审

18 引用 (Scopus)

摘要

This paper presents a new method that describes activity duration times, which can be as random fuzzy variables to solve the software project scheduling problem. It solves the problem of the present classic models, such as PERT and CPM, which are weak in solving project scheduling problem for software development due to the concurrent, iterative and evolutionary nature characteristics of software projects. Next, a novel stochastic software project scheduling model -expected cost model -is suggested. Furthermore, basing on genetic algorithm and random fuzzy simulation, a hybrid intelligent algorithm is designed to solve the expected cost model. Numerical experiments illustrate the effectiveness of the hybrid intelligent algorithm.

源语言英语
主期刊名Advances in Neural Networks - ISNN 2009 - 6th International Symposium on Neural Networks, ISNN 2009, Proceedings
60-69
页数10
版本PART 2
DOI
出版状态已出版 - 2009
已对外发布
活动6th International Symposium on Neural Networks, ISNN 2009 - Wuhan, 中国
期限: 26 5月 200929 5月 2009

出版系列

姓名Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics)
编号PART 2
5552 LNCS
ISSN(印刷版)0302-9743
ISSN(电子版)1611-3349

会议

会议6th International Symposium on Neural Networks, ISNN 2009
国家/地区中国
Wuhan
时期26/05/0929/05/09

指纹

探究 'Project scheduling problem for software development with random fuzzy activity duration times' 的科研主题。它们共同构成独一无二的指纹。

引用此