Multi-objective optimisation for energy-aware flexible job-shop scheduling problem with assembly operations

Weibo Ren, Jingqian Wen, Yan Yan, Yaoguang Hu*, Yu Guan, Jinliang Li

*此作品的通讯作者

科研成果: 期刊稿件文章同行评审

54 引用 (Scopus)

摘要

There is a lack of studies on joint optimisation of flexible job-shop scheduling problem (FJSP) considering energy consumption and production efficiency in the machining-assembly system. Thus, in this paper, we propose a methodology for multi-objective optimisation of energy-aware flexible job-shop scheduling during machining and assembly operations. First, a mixed integrated mathematical model is developed to improve production efficiency and minimise energy consumption. Then, a novel heuristic algorithm integrated particle swarm optimisation (PSO) and genetic algorithm (GA) is developed to address the established multi-objective problem. Moreover, numerical examples are carried out to verify the validity and performance of the solving methods in achieving energy awareness in the manufacturing system. Computational results are presented to demonstrate the advantage of solving the problem compared with the exact method and common heuristic algorithms, and the trade-off between production efficiency and energy efficiency is analysed to make the final decision for managers.

源语言英语
页(从-至)7216-7231
页数16
期刊International Journal of Production Research
59
23
DOI
出版状态已出版 - 2021

指纹

探究 'Multi-objective optimisation for energy-aware flexible job-shop scheduling problem with assembly operations' 的科研主题。它们共同构成独一无二的指纹。

引用此