Extensions of the resource-constrained project scheduling problem

Hongyan Ding, Cunbo Zhuang*, Jianhua Liu

*此作品的通讯作者

科研成果: 期刊稿件文献综述同行评审

23 引用 (Scopus)

摘要

The resource-constrained project scheduling problem (RCPSP) aims to schedule a set of activities subject to resource and precedence constraints to minimize the project makespan. The construction schedule optimization is modeled and solved as the RCPSP, and research on the RCPSP has had a positive impact on construction projects. However, given the narrow assumptions of the standard RCPSP model, it fails to capture many practical engineering requirements. Consequently, various extended problems and more competitive solutions have been developed. However, few studies have discussed the extensions of the RCPSP and corresponding optimization algorithms. This paper reviews the literature on project scheduling over the last decade. First, the standard RCPSP is described, and extended models are summarized based on objectives, constraints, and activities. Then, the research progress of the algorithm and other variants of the RCPSP are investigated. Finally, based on statistics obtained previously, current limitations, challenges, and future research directions are discussed.

源语言英语
文章编号104958
期刊Automation in Construction
153
DOI
出版状态已出版 - 9月 2023

指纹

探究 'Extensions of the resource-constrained project scheduling problem' 的科研主题。它们共同构成独一无二的指纹。

引用此