Distributed assembly shop scheduling problem for complex products considering multiskilled worker assignment and transportation time

Qinglin Gao, Hanlin Hu, Jianhua Liu, Cunbo Zhuang*, Hongyan Ding, Huiting Li

*此作品的通讯作者

科研成果: 期刊稿件文章同行评审

摘要

The distributed assembly hybrid flow shop scheduling problem (DAHFSP) is a type of distributed shop scheduling problem, and each distributed shop can be regarded as a hybrid flow shop. In distributed assembly processes for complex products such as satellites and missiles, transportation time and worker assignment have important effects on production scheduling. Based on real production situations, this study proposes a novel DAHFSP considering worker assignment and transportation time, aiming to minimise the makespan and the imbalance degree of worker workloads. First, to solve these problems, we construct a mathematical model and design a two-layer chromosome coding scheme including worker assignment and task sequence. Then, in the local search stage, we propose a mutation-based search method and an elite search method. On that basis, we propose a multi-objective evolutionary algorithm with reinforced elite retention strategy (MOEA-RERS). Finally, based on a set of 12 test instances generated by actual enterprise production data, we compare the MOEA-RERS algorithm with five multi-objective evolutionary algorithms. The results show that the MOEA-RERS algorithm is superior to other algorithms in terms of solution quality and distribution.

源语言英语
期刊International Journal of Production Research
DOI
出版状态已接受/待刊 - 2024

指纹

探究 'Distributed assembly shop scheduling problem for complex products considering multiskilled worker assignment and transportation time' 的科研主题。它们共同构成独一无二的指纹。

引用此