Ananlysis and Scheduling for Distributed Robust Production Lines with Bernoulli Machines and Sequence-dependent Setup Time

Guanzhong Zuo, Zhiyang Jia, Jiawei Shi, Gang Wang, Yongsheng Qi

科研成果: 书/报告/会议事项章节会议稿件同行评审

摘要

Driven by the increasing need of enterprises to meet the demands of multi-cooperation production, the distributed flow shop scheduling problem (DFSP) has emerged as a cutting-edge research topic in the field of flexible manufacturing. Because of the uncertainties in practical production environment of the distributed production lines, the processing efficiency of machines can be undetermined in different scenarios. In this paper, a robust model for DFSP with Bernoulli machines and sequence-dependent setup time is studied. Firstly, the robust model and the analysis of distributed production lines are formulated. Secondly, an improved genetic algorithm with linear rank selection and acceptance criterion is proposed, which has been empirically proven to effectively overcome the issue of being stuck in local optima. Finally, the result of the comparative experiments shows that the proposed improved genetic algorithm can solve the distributed flow shop scheduling problem with uncertain processing efficiency (UPE) and sequence-dependent setup time.

源语言英语
主期刊名Proceedings - 2023 China Automation Congress, CAC 2023
出版商Institute of Electrical and Electronics Engineers Inc.
1325-1330
页数6
ISBN(电子版)9798350303759
DOI
出版状态已出版 - 2023
活动2023 China Automation Congress, CAC 2023 - Chongqing, 中国
期限: 17 11月 202319 11月 2023

出版系列

姓名Proceedings - 2023 China Automation Congress, CAC 2023

会议

会议2023 China Automation Congress, CAC 2023
国家/地区中国
Chongqing
时期17/11/2319/11/23

指纹

探究 'Ananlysis and Scheduling for Distributed Robust Production Lines with Bernoulli Machines and Sequence-dependent Setup Time' 的科研主题。它们共同构成独一无二的指纹。

引用此