A capping technique for emergency response in offshore blowout accidents

Huixing Meng, Guoming Chen, Xiuquan Liu*

*此作品的通讯作者

科研成果: 期刊稿件文章同行评审

16 引用 (Scopus)

摘要

Capping stack is an emergency shut-in technique that can effectively control offshore blowout accidents. This technique stemmed the spilled oil well (Macondo) in 2010 Deepwater Horizon blowout accident. However, few efforts have been devoted to studying the way to efficiently and safely conduct the operation of capping stack. In this paper, program evaluation and review technique (PERT) was employed to quantitatively design the operation procedure of capping stack. A mechanical model was established to determine the configuration scheme of capping stack. And a sensitivity analysis of operational factors of capping stack was conducted through orthogonal tests. Experimental results recommend to optimize the operation process by reducing the working time of diamond cutting tool down-pass, Lower Marine Riser Package (LMRP) upper riser incision, LMRP and original Blowout Preventer (BOP) separation, and LMRP recovery, in order to guarantee that the whole operation can be completed as scheduled. The results show that the number of ram BOPs has little effect on the equivalent stress of conductors. To improve system reliability, a five-ram capping stack is recommended to be applied in the defined accident scenario. The maximum equivalent stress of conductors rates the drilling vessel offset as the primary factor, followed by shut-in pressure, ocean current and top tension. The drilling vessel offset needs to be given the priority control and the shut-in pressure should be jointly monitored.

源语言英语
文章编号103925
期刊Journal of Loss Prevention in the Process Industries
62
DOI
出版状态已出版 - 11月 2019
已对外发布

指纹

探究 'A capping technique for emergency response in offshore blowout accidents' 的科研主题。它们共同构成独一无二的指纹。

引用此