Abstract
Through a comparison of the MAP and SOVA algorithms of the Turbo code and an analysis on the SOVA algorithm, some improvements upon its time delay in Turbo code decoding were arrived at and measures for solving the problem were discussed. Through computer simulation, the paper presents some useful conclusions. Simulation results show that the improvements are effective.
Original language | English |
---|---|
Pages (from-to) | 105-108 |
Number of pages | 4 |
Journal | Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology |
Volume | 23 |
Issue number | 1 |
Publication status | Published - Feb 2003 |
Keywords
- MAP algorithm
- SOVA algorithm
- Turbo code
Fingerprint
Dive into the research topics of 'Time delay analysis of turbo code decoding algorithms'. Together they form a unique fingerprint.Cite this
Mao, N., Kuang, J. M., & Liu, J. K. (2003). Time delay analysis of turbo code decoding algorithms. Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology, 23(1), 105-108.