Three-dimensional predefined-time impact angle control guidance law with field-of-view limit

Jianan Wang, Xizi Tao, Wei Dong*, Chunyan Wang

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

9 Citations (Scopus)

Abstract

In this paper, an impact angle control guidance (IACG) law with predefined convergence time and seeker's field-of-view (FOV) limit is proposed in three-dimensional (3D) scenario. First, a predefined-time error dynamic is developed whose significance is revealed by comparison with conventional methods. Second, based on coupled engagement dynamics, a 3D predefined-time IACG law is derived by applying the proposed error dynamic. To tackle the FOV limit, two auxiliary functions are introduced into the IACG law. The robustness against disturbances and uncertainties is further improved by utilizing the terminal sliding mode technique. With the proposed guidance law, the impact-angle error can converge to zero exactly at a tunable predefined time. Finally, the effectiveness and performance of the proposed IACG law are shown by several simulations with comparative study.

Original languageEnglish
Pages (from-to)7621-7644
Number of pages24
JournalJournal of the Franklin Institute
Volume360
Issue number12
DOIs
Publication statusPublished - Aug 2023

Fingerprint

Dive into the research topics of 'Three-dimensional predefined-time impact angle control guidance law with field-of-view limit'. Together they form a unique fingerprint.

Cite this