    Implementing effective risk assessment for public–private partnership (PPP) waste-to-energy (WTE) incineration plant projects promotes the sustainable development of WTE incineration plants. However, some studies fail to consider multi-individuals participation and handle mutual compensation among risk factors, which affects the reliability of evaluation results and increases decision risks. Thus, we propose a methodology based on weighted multigranulation fuzzy rough sets (MGFRSs) over two universes to perform risk evaluation for PPP WTE incineration plant projects. Firstly, alternative risk factors are detected from different dimensions to construct a risk evaluation index system. Secondly, the BWM (best-worst method) is utilized to determined subjective expert weights and an improved DEMATEL (Decision Making Trial and Evaluation Laboratory) method is developed to derive objective expert weights. Combining subjective and objective expert weights, an optimization model is built to form the collective expert weights. Thirdly, to avoid mutual compensation among risk factors, multi-source heterogeneous information system-based weighted MGFRSs over two universes are proposed to evaluate PPP WTE plant projects and select a promising one. Finally, a case study is performed to illustrate the feasibility of the proposed methodology. Sensitivity analysis and comparative analysis are implemented to demonstrate the robustness, effectiveness, and superiority of the proposed methodology.

    Original languageEnglish
    Article number103120
    JournalSustainable Cities and Society
    Volume74
    DOIs
    Publication statusPublished - Nov 2021

    Keywords

    • BWM
    • Improved DEMATEL
    • PPP WTE Incineration plant projects
    • Risk assessment
    • Weighted multigranulation fuzzy rough sets

    Fingerprint

    Dive into the research topics of 'Risk assessment for PPP waste-to-energy incineration plant projects in china based on hybrid weight methods and weighted multigranulation fuzzy rough sets'. Together they form a unique fingerprint.

    Cite this