Rethinking the Construction Schedule Risk of Infrastructure Projects Based on Dialectical Systems and Network Theory

Long Chen, Long Chen, Qiuchen Lu*, Xiaojing Zhao

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

34 Citations (Scopus)
Plum Print visual indicator of research metrics
  • Citations
    • Citation Indexes: 34
  • Captures
    • Readers: 94
see details

Abstract

The construction of infrastructures is becoming increasingly complex and risky under uncertainty, which often results in construction delay. Many efforts have been made to identify and control construction schedule risks. However, previous efforts only focused on the diversity of risks with assumption that risks are independent. The ignorance of (1) interdependencies between the originalities of risks within infrastructures as a sociotechnical system, and (2) links between risks impedes the reasonable explanation for and assessment of the construction delay of infrastructures. This paper aims to develop a novel hybrid approach to address these issues based on dialectical systems and network theory. It first identified construction schedule risks from the perspective of dialectical systems at the industry level, which were further verified by global expert interviews and refined by questionnaire survey based on the Chinese infrastructure industry. Then, using network theory-based analysis, the key challenges and solutions were identified at project level based on a real infrastructure case. Seven key risks and 20 key risk links were identified with effective risk mitigation strategies provided for this case project. This research provides a new approach to understanding and analyzing construction schedule risks for better delivery of infrastructures. The results are not only helpful for the Chinese infrastructure industry, but with revisions are also applicable for other regions to improve construction schedule risk management.

Original languageEnglish
Article number04020066
JournalJournal of Management in Engineering - ASCE
Volume36
Issue number5
DOIs
Publication statusPublished - 1 Sept 2020

Keywords

  • Construction schedule risk
  • Dialectical systems theory
  • Network theory-based analysis

Fingerprint

Dive into the research topics of 'Rethinking the Construction Schedule Risk of Infrastructure Projects Based on Dialectical Systems and Network Theory'. Together they form a unique fingerprint.

Cite this

Chen, L., Chen, L., Lu, Q., & Zhao, X. (2020). Rethinking the Construction Schedule Risk of Infrastructure Projects Based on Dialectical Systems and Network Theory. Journal of Management in Engineering - ASCE, 36(5), Article 04020066. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000829