Real-time automatic rescheduling strategy for an urban rail line by integrating the information of fault handling

Yuan Gao*, Lixing Yang, Ziyou Gao

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

34 Citations (Scopus)

Abstract

In the operation of urban rails, faults are inevitable, which leads to deviation between the actual timetable and the planned timetable. In nowadays, timetable rescheduling strategies rarely integrate the information of fault handling. In this paper, we develop a real-time automatic rescheduling strategy, which integrates the dynamic information of fault handling. The rescheduled timetable is obtained by a mathematical optimization model, the constraints set of which is automatically generated and adjusted as more information of fault handling is feedback. Compared with the experience-based rescheduling methods, the automatic rescheduling strategy reacts more quickly, and uses the information of fault handling more efficiently. A simulation system for testing the automatic rescheduling strategy is built, which uses the data of the Beijing Yizhuang metro line. Via testing on the simulation system, the effectiveness and efficiency of the automatic rescheduling strategy are validated.

Original languageEnglish
Pages (from-to)246-267
Number of pages22
JournalTransportation Research Part C: Emerging Technologies
Volume81
DOIs
Publication statusPublished - Aug 2017
Externally publishedYes

Keywords

  • Fault handling
  • Mathematical optimization
  • Timetable rescheduling
  • Urban rail line

Fingerprint

Dive into the research topics of 'Real-time automatic rescheduling strategy for an urban rail line by integrating the information of fault handling'. Together they form a unique fingerprint.

Cite this