TY - JOUR
T1 - Political Risk Paths in International Construction Projects
T2 - Case Study from Chinese Construction Enterprises
AU - Chang, Tengyuan
AU - Deng, Xiaopeng
AU - Hwang, Bon Gang
AU - Zhao, Xiaojing
N1 - Publisher Copyright:
© 2018 Tengyuan Chang et al.
PY - 2018
Y1 - 2018
N2 - International construction enterprises (ICEs) have been plagued with political risks in the global market. To ensure the success of political risk management, it is necessary to comprehend the political risks in international construction projects. This study aims at exploring the political risk paths in international construction projects. The preliminary political risk factors and paths were proposed from the literature review. A survey questionnaire was developed to collect political risk cases faced by Chinese construction enterprises (CCEs) performing international construction projects, and 264 valid cases were received and analyzed for this study. Adopting the confirmatory factor analysis (CFA) method, 6 macrofactors ("sociopolitical stability" (A), "legal and regulatory" (B), "social safety" (C), "economy performance" (D), "attitude towards foreigners" (E), and "international environment" (F)) and 2 microfactors ("low exposure" (G) and "capability of enterprises" (H)) were identified. Moreover, the results of path analysis illustrated that 7 factors (A, B, C, D, E, G, and H) had the significant direct negative effect on "risk consequences" and 3 factors (A, D, and F) had the indirect negative effect on "risk consequences." The findings from this study help practitioners gain an in-depth understanding of political risks in international construction projects and provide a useful reference for ICEs to manage political risks when venturing outside their home countries.
AB - International construction enterprises (ICEs) have been plagued with political risks in the global market. To ensure the success of political risk management, it is necessary to comprehend the political risks in international construction projects. This study aims at exploring the political risk paths in international construction projects. The preliminary political risk factors and paths were proposed from the literature review. A survey questionnaire was developed to collect political risk cases faced by Chinese construction enterprises (CCEs) performing international construction projects, and 264 valid cases were received and analyzed for this study. Adopting the confirmatory factor analysis (CFA) method, 6 macrofactors ("sociopolitical stability" (A), "legal and regulatory" (B), "social safety" (C), "economy performance" (D), "attitude towards foreigners" (E), and "international environment" (F)) and 2 microfactors ("low exposure" (G) and "capability of enterprises" (H)) were identified. Moreover, the results of path analysis illustrated that 7 factors (A, B, C, D, E, G, and H) had the significant direct negative effect on "risk consequences" and 3 factors (A, D, and F) had the indirect negative effect on "risk consequences." The findings from this study help practitioners gain an in-depth understanding of political risks in international construction projects and provide a useful reference for ICEs to manage political risks when venturing outside their home countries.
UR - http://www.scopus.com/inward/record.url?scp=85053026406&partnerID=8YFLogxK
U2 - 10.1155/2018/6939828
DO - 10.1155/2018/6939828
M3 - Article
AN - SCOPUS:85053026406
SN - 1687-8086
VL - 2018
JO - Advances in Civil Engineering
JF - Advances in Civil Engineering
M1 - 6939828
ER -