TY - JOUR
T1 - On-site monitoring technology of complex product assembly workshop based on process
AU - Ye, Jianhui
AU - Liu, Shaoli
AU - Liu, Jianhua
AU - Weng, Gang
N1 - Publisher Copyright:
© 2017, Editorial Department of CIMS. All right reserved.
PY - 2017/7/1
Y1 - 2017/7/1
N2 - Aiming at the problems of on-site monitoring in the complex product's assembly workshop, a process-based monitoring technology was proposed. The control process of daily production plan was analyzed, and the data model based on daily production plan was proposed. For the inconstant requirements of assembly workshop monitoring, a method that had three-tiered architecture including data acquisition, data processing and data matching was created to build the smart monitoring Kanban, and the monitoring model was established based on assembly process in workshop on-site. The assembly workshop on-site monitoring Kanban system was developed for the complex product, which had the characteristics of real-time, expansibility, process-oriented and meticulous management. The feasibility of the proposed methods was validated, and satisfactory results were obtained.
AB - Aiming at the problems of on-site monitoring in the complex product's assembly workshop, a process-based monitoring technology was proposed. The control process of daily production plan was analyzed, and the data model based on daily production plan was proposed. For the inconstant requirements of assembly workshop monitoring, a method that had three-tiered architecture including data acquisition, data processing and data matching was created to build the smart monitoring Kanban, and the monitoring model was established based on assembly process in workshop on-site. The assembly workshop on-site monitoring Kanban system was developed for the complex product, which had the characteristics of real-time, expansibility, process-oriented and meticulous management. The feasibility of the proposed methods was validated, and satisfactory results were obtained.
KW - Assembly workshop
KW - Complex product
KW - Daily production plan
KW - Data collection and management
KW - Electronic Kanban
UR - http://www.scopus.com/inward/record.url?scp=85032860237&partnerID=8YFLogxK
U2 - 10.13196/j.cims.2017.07.012
DO - 10.13196/j.cims.2017.07.012
M3 - Article
AN - SCOPUS:85032860237
SN - 1006-5911
VL - 23
SP - 1469
EP - 1480
JO - Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS
JF - Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS
IS - 7
ER -