Fuzzy resource-constrained project scheduling problem for software development

Xianggang Wang*, Wei Huang

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

6 Citations (Scopus)

Abstract

This paper presents a new method to solve the resource- constrained project scheduling problem for software development. In this method, activity duration times are described as fuzzy variables and resource-constrained software project scheduling problems are described as fuzzy programming models. First, how to model the software project scheduling problem under the fuzzy environment conditions is proposed. Second, in order to satisfy the different requirements of decision-making, two novel fuzzy project scheduling models, expected cost model and credibility maximization model, are suggested. Third, a hybrid intelligent algorithm integrated by genetic algorithm and fuzzy simulation is designed to solve the above two fuzzy programming models. Numerical experiments illustrate the effectiveness of the hybrid intelligent algorithm.

Original languageEnglish
Pages (from-to)25-30
Number of pages6
JournalWuhan University Journal of Natural Sciences
Volume15
Issue number1
DOIs
Publication statusPublished - Jan 2010
Externally publishedYes

Keywords

  • Fuzzy simulation
  • Genetic algorithm
  • Hybrid intelligent algorithm
  • Project scheduling problem

Fingerprint

Dive into the research topics of 'Fuzzy resource-constrained project scheduling problem for software development'. Together they form a unique fingerprint.

Cite this