@inproceedings{a1929542e4a04b4fa30ffdbf6513f144,
title = "Fixed-Time Impact Time Control Guidance Law for Missiles With Input Saturation Constraints Against Maneuvering Targets",
abstract = "This paper is concerned with the fixed-time impact time control guidance (ITCG) problem against maneuvering targets. Firstly, the fixed-time observers are adopted to estimate the maneuvering target's unknown acceleration. Then, a fixed-time ITCG law is derived by resorting to the time-to-go of deviated pursuit guidance, where the unknown target acceleration is compensated based on the estimates obtained from the fixed-time observers. Moreover, an auxiliary system is adopted to tackle the frequently encountered input saturation constraints, and the fixed-time stability of the proposed ITCG law is analyzed. Finally, simulation results are provided to demonstrate the designed ITCG law.",
keywords = "Impact time control guidance, fixed-time control, input saturation, maneuvering targets",
author = "Xiangjun Ding and Jianan Wang and Weihao Song and Jiayuan Shan",
note = "Publisher Copyright: {\textcopyright} 2023 IEEE.; 38th Youth Academic Annual Conference of Chinese Association of Automation, YAC 2023 ; Conference date: 27-08-2023 Through 29-08-2023",
year = "2023",
doi = "10.1109/YAC59482.2023.10401617",
language = "English",
series = "Proceedings - 2023 38th Youth Academic Annual Conference of Chinese Association of Automation, YAC 2023",
publisher = "Institute of Electrical and Electronics Engineers Inc.",
pages = "780--785",
booktitle = "Proceedings - 2023 38th Youth Academic Annual Conference of Chinese Association of Automation, YAC 2023",
address = "United States",
}