Design of an array signal time delay analysis system

Ming Li*, Zi Yuan, Chun Lan Jiang, Zai Cheng Wang

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

Abstract

To design a time delay auxiliary analysis system for array signal time delay estimation, a data acquisition system with eight channels is designed and signal acquisition experiment is carried out. A virtual instrument is selected as development tool for the analysis system design. The models included in the analysis system are waveform playback, spectrum analysis, filtering analysis and time delay analysis. Spectrum analysis and time delay estimation of the signal have been carried out with the system, and curve of the time delay vs. time is given. Research result reveals that the system is helpful in the research of time delay estimation.

Original languageEnglish
Pages (from-to)56-59
Number of pages4
JournalBeijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology
Volume34
Issue number1
Publication statusPublished - Jan 2014

Keywords

  • Sensor array
  • Time delay estimation(TDE)
  • Virtual instrument

Fingerprint

Dive into the research topics of 'Design of an array signal time delay analysis system'. Together they form a unique fingerprint.

Cite this

Li, M., Yuan, Z., Jiang, C. L., & Wang, Z. C. (2014). Design of an array signal time delay analysis system. Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology, 34(1), 56-59.