Case study on optimization strategy of utility of coal mine crisis reduction capability

Tie Zhong Liu*, Wei Li

*Corresponding author for this work

    Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

    Abstract

    Using the empirical research methods, the optimization strategy of coal mine crisis reduction capability utility was discussed from the perspective of the coal mine employee utility. Five elements of coal mine crisis reduction capability were put forward which consist of environmental preparation, organizational preparation, personnel preparation, competitive preparation and learning preparation, as well as four elements of staff utility of coal mine which consist of enterprise and job satisfaction, communication satisfaction, benefit satisfaction and promotion satisfaction. The questionnaire was designed based on the Likert six-point scale. JCMG was chosen as sample, then statistical method, reliability analysis and Structural Equation Method were used to analysis the data. The conclusion of the optimization strategy of the coal mine crisis reduction capability based on the utility was obtained: first, strengthening the coal mine crisis study; second, promoting the competitiveness of the coal mine; third, concerning employees' enterprise and job satisfaction to influence the environment preparation element; forth, special concerning the coal mine employees' promotion satisfaction to prevent the negative influence.

    Original languageEnglish
    Title of host publication2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management, IE and EM 2011
    Pages1221-1227
    Number of pages7
    EditionPART 2
    DOIs
    Publication statusPublished - 2011
    Event2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management, IE and EM 2011 - Changchun, China
    Duration: 3 Sept 20115 Sept 2011

    Publication series

    Name2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management, IE and EM 2011
    NumberPART 2

    Conference

    Conference2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management, IE and EM 2011
    Country/TerritoryChina
    CityChangchun
    Period3/09/115/09/11

    Keywords

    • crisis reduction capability of coal mine
    • employee satisfaction
    • employee utility of coal mine
    • optimization strategy

    Cite this