An integrated model for multi-resource constrained scheduling problem considering multi-product and resource-sharing

Changchun Liu, Xi Xiang, Li Zheng*, Jing Ma

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

13 Citations (Scopus)

Abstract

This paper studies a multi-resource constrained scheduling problem considering multi-product and resource-sharing in the manufacturing supply chain, in which many independent production units coordinate with a truck resource manager. A mixed integer programming model is formulated to minimise the total system cost and some analytical properties are proposed to tighten the model. A Lagrangian relaxation-based heuristic with several enhancements, e.g. warm startup, approximating solve and parallel computation of subproblems, is proposed to solve the model. Finally, computational experiments are conducted to verify that (i) the proposed method has a better performance in both objective and CPU time than CPLEX, (ii) all three enhancements can help reduce the total computation time and (iii) a certain degree of resource-sharing can help reduce the total cost of the system.

Original languageEnglish
Pages (from-to)6491-6511
Number of pages21
JournalInternational Journal of Production Research
Volume56
Issue number19
DOIs
Publication statusPublished - 2 Oct 2018
Externally publishedYes

Keywords

  • Lagrangian relaxation-based heuristic
  • multi-product
  • multi-resource constrained scheduling problem
  • resource-sharing
  • truck scheduling

Fingerprint

Dive into the research topics of 'An integrated model for multi-resource constrained scheduling problem considering multi-product and resource-sharing'. Together they form a unique fingerprint.

Cite this

Liu, C., Xiang, X., Zheng, L., & Ma, J. (2018). An integrated model for multi-resource constrained scheduling problem considering multi-product and resource-sharing. International Journal of Production Research, 56(19), 6491-6511. https://doi.org/10.1080/00207543.2017.1363428