摘要
This paper studies a deploying process of a rocket-towed net system. In the main, with reference to Kane's equation, a two-dimension multi-body lumped mass system model is established to provide a basis for formulation and analysis of the deploying process. Some assumptions are proposed to simplify, but without losing generality, the motion of the net. The simulation results show that a big shock occurs at the towing wire just before the net is about to move.
源语言 | 英语 |
---|---|
页(从-至) | 279-285 |
页数 | 7 |
期刊 | International Journal of Modelling, Identification and Control |
卷 | 20 |
期 | 3 |
DOI | |
出版状态 | 已出版 - 2013 |