TY - GEN
T1 - Study on forward simulation model for extended-range electric bus
AU - Cao, Dong Jiang
AU - Lin, Cheng
AU - Sun, Fengchun
PY - 2012
Y1 - 2012
N2 - Based on analyzing of two basic modeling methods of Extended-Range Electric Bus (E-REB), this paper had established a E-REB's Forward-Simulation model, and described main sub models in detail. Basised to the parameters of a certain E-REB, the Forward model was simulated under UDDS driving cycle, and some significant characteristic curves and dynamics, economics simulation data were obtained. Compared with experimental values of the E-REB, the error was within allowable range. So the results have proven that the Forward-Simulation model was rational and practical.
AB - Based on analyzing of two basic modeling methods of Extended-Range Electric Bus (E-REB), this paper had established a E-REB's Forward-Simulation model, and described main sub models in detail. Basised to the parameters of a certain E-REB, the Forward model was simulated under UDDS driving cycle, and some significant characteristic curves and dynamics, economics simulation data were obtained. Compared with experimental values of the E-REB, the error was within allowable range. So the results have proven that the Forward-Simulation model was rational and practical.
KW - electric bus
KW - extended-range
KW - forward-simulation
UR - http://www.scopus.com/inward/record.url?scp=84873692388&partnerID=8YFLogxK
U2 - 10.1109/WCSE.2012.49
DO - 10.1109/WCSE.2012.49
M3 - Conference contribution
AN - SCOPUS:84873692388
SN - 9780769548630
T3 - Proceedings of the 2012 3rd World Congress on Software Engineering, WCSE 2012
SP - 202
EP - 206
BT - Proceedings of the 2012 3rd World Congress on Software Engineering, WCSE 2012
T2 - 2012 3rd World Congress on Software Engineering, WCSE 2012
Y2 - 6 November 2012 through 8 November 2012
ER -