TY - JOUR
T1 - Incremental material kitting and circulation state management technology in assembly execution process of complex products
AU - Zhou, Jian
AU - Wang, Ai Min
AU - Li, Zhou Yu
PY - 2014/7/1
Y1 - 2014/7/1
N2 - Aiming at the demand of complex products with multi-variety and less-batch for timeliness, accuracy, completeness in the assembly execution process, the technology of incremental material kitting coordination and materials circulation state management oriented to assembly execution process was proposed. Based on the kit process data of process-level structured assembly materials, a incremental material kitting state coordination management mechanism which took assembly execution process as the main line, crafts process node as the core and state of the material requirements as the management object was developed through the collaborative management of material content, time and distribution. Aiming at the necessity for rational allocation of limited assembly material resources, a kit-priority evaluation model was established, and the optimization of material approval was realized by combining with the time node of production plan. The inventory management system in flat workshop and the distribution technology of 2D barcode material pallet were proposed to realize revolving kitting resource pallet preparation and closed-loop control of workshop material supply. Through the operational analysis of actual project instance, the reasonableness and effectiveness of the technology was verified.
AB - Aiming at the demand of complex products with multi-variety and less-batch for timeliness, accuracy, completeness in the assembly execution process, the technology of incremental material kitting coordination and materials circulation state management oriented to assembly execution process was proposed. Based on the kit process data of process-level structured assembly materials, a incremental material kitting state coordination management mechanism which took assembly execution process as the main line, crafts process node as the core and state of the material requirements as the management object was developed through the collaborative management of material content, time and distribution. Aiming at the necessity for rational allocation of limited assembly material resources, a kit-priority evaluation model was established, and the optimization of material approval was realized by combining with the time node of production plan. The inventory management system in flat workshop and the distribution technology of 2D barcode material pallet were proposed to realize revolving kitting resource pallet preparation and closed-loop control of workshop material supply. Through the operational analysis of actual project instance, the reasonableness and effectiveness of the technology was verified.
KW - Assembly execution process
KW - Circulation state coordination
KW - Complex product
KW - Incremental kitting
KW - Material barcode
UR - http://www.scopus.com/inward/record.url?scp=84907585171&partnerID=8YFLogxK
U2 - 10.13196/j.cims.2014.07.zhoujian.1583.16.2014078
DO - 10.13196/j.cims.2014.07.zhoujian.1583.16.2014078
M3 - Article
AN - SCOPUS:84907585171
SN - 1006-5911
VL - 20
SP - 1583
EP - 1598
JO - Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS
JF - Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS
IS - 7
ER -