A branch-and-price approach for trip sequence planning of high-speed train units

Yuan Gao*, Marie Schmidt, Lixing Yang, Ziyou Gao

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

17 Citations (Scopus)

Abstract

In high-speed railway operations, a trip sequence plan is made once the timetable is determined, and serves as a reference in the subsequent operations of train units scheduling. In light of the maintenance requirements of train units and periodicity characteristics of trip sequences, we introduce a trip sequence graph to describe the train units’ movement and coupling/splitting in a railway network. Based on the trip sequence graph, two integer linear programming models are then formulated, namely a path-based model and an arc-based model. Integrated with the characteristics of the trip sequence graph, a customized branch-and-price algorithm is developed to solve the path-based model. The two models are applied to the high-speed railway network in eastern China, and through numerical experiments, the effectiveness and applicability of the models are discussed.

Original languageEnglish
Article number102150
JournalOmega (United Kingdom)
Volume92
DOIs
Publication statusPublished - Apr 2020

Keywords

  • Branch-and-price algorithm
  • High-speed railway
  • Maintenance
  • Train units scheduling
  • Trip sequence planning