摘要
Through a comparison of the MAP and SOVA algorithms of the Turbo code and an analysis on the SOVA algorithm, some improvements upon its time delay in Turbo code decoding were arrived at and measures for solving the problem were discussed. Through computer simulation, the paper presents some useful conclusions. Simulation results show that the improvements are effective.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 105-108 |
| 页数 | 4 |
| 期刊 | Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology |
| 卷 | 23 |
| 期 | 1 |
| 出版状态 | 已出版 - 2月 2003 |
学术指纹
探究 'Time delay analysis of turbo code decoding algorithms' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver