Study of investment estimation model of the aerospace special projects

Feng Xue Zhao*, Xiao Zhu Bie, Pei Wu Dong

*此作品的通讯作者

    科研成果: 期刊稿件文章同行评审

    摘要

    Estimation of investment is a crucial step of aerospace special project management. In order to improve the accuracy and rationality of the investment estimation, we analyzed the structure of aerospace special project investment. Applying the principles of project statistics, we established an estimation model based on project decomposition. We also proposed a correction model of gross investment estimation and an apportion method of other costs of subsystem construction. At last the merits and drawbacks of our model were discussed.

    源语言英语
    页(从-至)13-16
    页数4
    期刊Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology
    26
    SUPPL.
    出版状态已出版 - 6月 2006

    引用此