跳到主要导航 跳到搜索 跳到主要内容

Short-Term Rolling Stock Scheduling and Platform Assignment: A Branch-and-Check Method

  • Lin Yang
  • , Yuan Gao*
  • , Valentina Cacchiani*
  • , Suxiu Xu
  • , Huiling Fu
  • *此作品的通讯作者
  • Beijing Institute of Technology
  • University of Bologna
  • Beijing Jiaotong University

科研成果: 期刊稿件 › 文章 › 同行评审

摘要

Railway passenger demand fluctuates because of events, holidays, and individual traveler activities, making it difficult to predict several months in advance. Market-oriented railway plans feature strategies for canceling or adding train trips according to short-term forecasted passenger demand. This results in dynamic adjustments of the rolling stock schedule (RSS) and the train platforming plan (TPP) on a daily basis. The RSS defines the schedule of the train units (TUs), that is, the sequence of trips that each TU will execute and the maintenance appointments it has to undergo. The TPP defines the assignment of platforms to TUs: when two trips are executed in sequence by the same TU, a platform has to be assigned to the TU for the trip connection. Because of demand fluctuation, the RSS has to be adjusted to perform a set of trips different from those in the original plan, requiring new trip sequences and rescheduled maintenance appointments for the TUs, whereas the TPP has to be modified to guarantee the feasible assignment of the platforms to the TUs performing the newly defined trip sequences. To assist railway departments in making optimized decisions, this work studies the integrated adjustment of the RSS and TPP by proposing an integer linear programming model and an exact decomposition algorithm. The integrated model consists of two parts: (i) rolling stock scheduling with maintenance constraints, and (ii) platform assignment. The goal is to minimize the operating costs and the deviations from the original plan. The decomposition algorithm consists of a branch-and-check (B&C) method in which maintenance constraints and platform assignment are handled by dynamic cut generation, and problem-specific acceleration techniques are incorporated to reduce the search space and the computation times. The proposed B&C method is tested on real-world instances from the Chinese high-speed railway system, involving up to 981 trips, showing that optimal solutions are obtained within one hour of computation time. It is shown that the B&C method clearly outperforms solving the integrated model by a general-purpose solver even on medium-size instances. Furthermore, comparisons with different sequential methods, which firstly adjust the RSS and then compute a new TPP, highlight the benefits of the integrated framework.

源语言英语
页(从-至)742-764
页数23
期刊Transportation Science
卷60
期5
DOI
出版状态已出版 - 1 9月 2026
已对外发布是

学术指纹

探究 'Short-Term Rolling Stock Scheduling and Platform Assignment: A Branch-and-Check Method' 的科研主题。它们共同构成独一无二的学术指纹。

引用此