跳到主要导航 跳到搜索 跳到主要内容

Scheduling technology with complexity cooperation constrains

  • Jingsheng Li*
  • , Aimin Wang
  • , Chengtong Tang
  • *此作品的通讯作者
  • Beijing Institute of Technology

科研成果: 书/报告/会议事项章节会议稿件同行评审

摘要

A new kind of scheduling method for the complexity cooperation constrains is build to solve the cooperation problem of hierarchical kit and assembling pull in job shop and assembling production. Aiming to solve this problem, the methods are proposed to support the scheduling progress. The virtual kit process is adopted for assembling scheduling. The job shop and assemblage process unified data model is build, which is based on complex producing constraint by synthetically considering the process relation, production resources, scheduling time, hierarchical kit and other scheduling rules. The hybrid scheduling arithmetic based on heuristics rules is proposed, which is grouped by the positive pull and push-down scheduling arithmetic. In the end the effectiveness of the system is tested and verified by a real instance.

源语言英语
主期刊名Proceedings of 2010 International Conference on Intelligent Control and Information Processing, ICICIP 2010
606-610
页数5
版本PART 1
DOI
出版状态已出版 - 2010
活动2010 International Conference on Intelligent Control and Information Processing, ICICIP 2010 - Dalian, 中国
期限: 13 8月 201015 8月 2010

丛书

姓名Proceedings of 2010 International Conference on Intelligent Control and Information Processing, ICICIP 2010
编号PART 1

会议

会议2010 International Conference on Intelligent Control and Information Processing, ICICIP 2010
国家/地区中国
Dalian
时期13/08/1015/08/10

学术指纹

探究 'Scheduling technology with complexity cooperation constrains' 的科研主题。它们共同构成独一无二的学术指纹。

引用此