Optimization Algorithm for Construction Procedure Scheduling in Prefabricated Construction Based on NSGA-III

  • Zhenpeng Zhang
  • , Xiaowen Li
  • , Yelin Ma
  • , Jingshun Lu
  • , Jiajun Wu
  • , Runqi Chai
  • The Third Construction CO. Ltd of China Construction First Gro
  • Beijing Institute of Technology

科研成果: 书/报告/会议事项章节会议稿件同行评审

摘要

In recent years, prefabricated construction has emerged as a significant trend in the development of the construction industry. Compared with the traditional construction methods, prefabricated buildings is more integrated, standard-ized and mechanized, and the uncontrollable factors in the construction process are significantly reduced, which has more room for optimization in the planning of various schemes. This study examines the construction process constraints and material residual constraints and presents a multi-objective optimisation problem aimed at minimising the overall construction time and maximising the overall scheduling factor. The NSGA-III is employed to solve this problem. Experimental results demonstrate the effectiveness and superiority of the proposed algorithm.

源语言英语
主期刊名Proceedings - 2023 China Automation Congress, CAC 2023
出版商Institute of Electrical and Electronics Engineers Inc.
3399-3404
页数6
ISBN(电子版)9798350303759
DOI
出版状态已出版 - 2023
活动2023 China Automation Congress, CAC 2023 - Chongqing, 中国
期限: 17 11月 202319 11月 2023

丛书

姓名Proceedings - 2023 China Automation Congress, CAC 2023

会议

会议2023 China Automation Congress, CAC 2023
国家/地区中国
Chongqing
时期17/11/2319/11/23

学术指纹

探究 'Optimization Algorithm for Construction Procedure Scheduling in Prefabricated Construction Based on NSGA-III' 的科研主题。它们共同构成独一无二的学术指纹。

引用此