摘要
With the extensive integration of high-penetration renewable energy resources, more fast-response frequency regulation (FR) providers are required to eliminate the impact of uncertainties from loads and distributed generators (DGs) on system security and stability. As a high-quality FR resource, community integrated energy station (CIES) can effectively respond to frequency deviation caused by renewable energy generation, helping to solve the frequency problem of power system. This paper proposes an optimal planning model of CIES considering FR service. First, the model of FR service is established to unify the time scale of FR service and economic operation. Then, an optimal planning model of CIES considering FR service is proposed, with which the revenue of participating in the FR service is obtained under market mechanism. The flexible electricity pricing model is introduced to flatten the peak tie-line power of CIES. Case studies are conducted to analyze the annual cost and the revenue of CIES participating in FR service, which suggest that providing ancillary services can bring potential revenue.
| 源语言 | 英语 |
|---|---|
| 期刊论文编号 | 9335699 |
| 页(从-至) | 264-273 |
| 页数 | 10 |
| 期刊 | Journal of Modern Power Systems and Clean Energy |
| 卷 | 9 |
| 期 | 2 |
| DOI | |
| 出版状态 | 已出版 - 3月 2021 |
| 已对外发布 | 是 |
联合国可持续发展目标
此成果有助于实现下列可持续发展目标:
-
可持续发展目标 7 经济适用的清洁能源
学术指纹
探究 'Optimal Planning of Community Integrated Energy Station Considering Frequency Regulation Service' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver