跳到主要导航 跳到搜索 跳到主要内容

Optimal placement of PMUs and communication links for distributed state estimation in distribution networks

  • Zhida Zhao
  • , Hao Yu
  • , Peng Li*
  • , Xiangyu Kong
  • , Jianzhong Wu
  • , Chengshan Wang
  • *此作品的通讯作者

科研成果: 期刊稿件文章同行评审

摘要

With the expansion in scale and complexity of distribution networks, distributed state estimation (DSE), a real-time database for other on-line applications, is becoming popular for large-scale active distribution networks (ADN). Measurements from phasor measurement units (PMUs) with the same time stamp can assist DSE to obtain faster and more accurate estimation; however, the configuration of PMUs and communication links should be updated to support data collection and transmission. This paper proposes an optimal PMUs and communication links placement method for DSE in distribution networks. A network partitioning method is presented with the aim of balancing calculation times among subareas. Then, a binary integer linear programming model that simultaneously considers the optimal placement of PMUs, phasor data concentrators (PDCs) and communication links is proposed. The economy of the configuration scheme is guaranteed on the premise that the network is fully observable. Finally, case studies on the IEEE 33-node, PG&E 69-node and IEEE 123-node systems verify the feasibility of the proposed method.

源语言英语
文章编号113963
期刊Applied Energy
256
DOI
出版状态已出版 - 15 12月 2019
已对外发布

指纹

探究 'Optimal placement of PMUs and communication links for distributed state estimation in distribution networks' 的科研主题。它们共同构成独一无二的指纹。

引用此