T1 - Joint scheduling of customized bus and urban rail transit for spectator assembly in mega-events
AU - An, Xiaojie
AU - Feng, Ziyan
AU - Li, Xiang
N1 - Publisher Copyright:
© 2026 Elsevier Ltd.
PY - 2026
Y1 - 2026
N2 - In the pre-event assembly stage of mega-events, customized buses (CBs) and urban rail transit (URT) are typically jointly responsible for transporting spectators from remote assembly points to the event venue. Without properly coordinated scheduling, transfer operations may suffer severe congestion, prolong the assembly process, and increase the risk of delays. This paper studies the coordinated scheduling of CBs and URT services for pre-event spectator assembly in mega-events under predefined planning settings, including assembly locations, service areas, connecting URT stations, and the URT network. A mixed-integer nonlinear programming model is formulated to capture key factors such as multi-batch spectator organization, cyclic CB scheduling, and train safety operations. The objective is to minimize the latest arrival time across all spectator batches to enhance overall assembly efficiency. To address the resulting computational complexity, the model is first linearized into a mixed-integer linear programming model. An accelerated Benders decomposition algorithm equipped with three acceleration strategies, time-window preprocessing, model restructuring with conflict-driven cut generation, and valid inequalities, is then developed to improve exact solution efficiency. Numerical experiments and a real-world case study based on the Beijing URT network demonstrate that the proposed model and algorithm can generate high-quality coordinated schedules within reasonable computing times, confirming their effectiveness and applicability to practical mega-event planning.
AB - In the pre-event assembly stage of mega-events, customized buses (CBs) and urban rail transit (URT) are typically jointly responsible for transporting spectators from remote assembly points to the event venue. Without properly coordinated scheduling, transfer operations may suffer severe congestion, prolong the assembly process, and increase the risk of delays. This paper studies the coordinated scheduling of CBs and URT services for pre-event spectator assembly in mega-events under predefined planning settings, including assembly locations, service areas, connecting URT stations, and the URT network. A mixed-integer nonlinear programming model is formulated to capture key factors such as multi-batch spectator organization, cyclic CB scheduling, and train safety operations. The objective is to minimize the latest arrival time across all spectator batches to enhance overall assembly efficiency. To address the resulting computational complexity, the model is first linearized into a mixed-integer linear programming model. An accelerated Benders decomposition algorithm equipped with three acceleration strategies, time-window preprocessing, model restructuring with conflict-driven cut generation, and valid inequalities, is then developed to improve exact solution efficiency. Numerical experiments and a real-world case study based on the Beijing URT network demonstrate that the proposed model and algorithm can generate high-quality coordinated schedules within reasonable computing times, confirming their effectiveness and applicability to practical mega-event planning.
KW - Benders decomposition
KW - Joint scheduling
KW - Mega-events
KW - Mixed-integer programming
KW - Spectator assembly
UR - https://www.scopus.com/pages/publications/105053340830
U2 - 10.1016/j.tre.2026.105295
DO - 10.1016/j.tre.2026.105295
M3 - Article
AN - SCOPUS:105053340830
SN - 1366-5545
JO - Transportation Research Part E: Logistics and Transportation Review
JF - Transportation Research Part E: Logistics and Transportation Review
M1 - 105295
ER -