跳到主要导航 跳到搜索 跳到主要内容

Joint Scheduling for Multi-load AGVs and Parallel Production Lines Considering Bernoulli Machines

  • Zhiyuan Zeng*
  • , Zhiyang Jia
  • , Zongyang Wu
  • *此作品的通讯作者
  • Beijing Institute of Technology

科研成果: 书/报告/会议事项章节会议稿件同行评审

摘要

With the development of modern manufacturing, the scheduling problem of multi-load AGVs and parallel machines (MAGVPM) is gradually becoming an important issue in the field of production optimization. Parallel machines represent a generalized concept in manufacturing environments, where component processing typically involves multiple stages corresponding to distinct machines. This study proposes a novel scheduling problem integrating multi-load AGVs with parallel production lines, which falls within the scope of MAGVPM scheduling problems. To address the interdependencies between serial production lines and AGV logistics systems, a holistic production scheduling model consisting of transportation and processing tasks was formulated. For the serial line featuring Bernoulli machines and capacity-limited buffers, Markov method enables precise computation of job processing times. An enhanced tabu search algorithm that incorporates genetic operators to generate feasible solutions is implemented. The effectiveness of the improved tabu algorithm was proved through computational experiments.

源语言英语
主期刊名Proceedings - 2025 China Automation Congress, CAC 2025
出版商Institute of Electrical and Electronics Engineers Inc.
3971-3976
页数6
ISBN(电子版)9798331589677
DOI
出版状态已出版 - 2025
已对外发布
活动2025 China Automation Congress, CAC 2025 - Harbin, 中国
期限: 26 9月 202528 9月 2025

丛书

姓名Proceedings - 2025 China Automation Congress, CAC 2025

会议

会议2025 China Automation Congress, CAC 2025
国家/地区中国
Harbin
时期26/09/2528/09/25

学术指纹

探究 'Joint Scheduling for Multi-load AGVs and Parallel Production Lines Considering Bernoulli Machines' 的科研主题。它们共同构成独一无二的学术指纹。

引用此