TY - JOUR
T1 - Inexact chance-constrained linear programming model for optimal water pollution management at the watershed scale
AU - Liu, Yong
AU - Guo, Huaicheng
AU - Zhou, Feng
AU - Qin, Xiaosheng
AU - Huang, Kai
AU - Yu, Yajuan
PY - 2008/7
Y1 - 2008/7
N2 - An inexact chance-constrained linear programming (ICCLP) model for optimal water pollution management at the watershed scale was developed. We selected the net expenditures of the alternative strategies, including initial capital investment and operating costs, as the objectives of water pollution management. The total environmental capacity of the water bodies at different probability levels (qi) was considered a key constraint; other constraints included in the model were government minimum requirements on farmland area, land cover, treatment rate of domestic wastewater and rural wastes, and certain technical constraints. The ICCLP model was applied to Lake Qionghai watershed in China for water quality improvement with the goal of achieving a minimum total cost. Alternative strategies were incorporated following discussions with shareholders and experts. A three-period optimization was conducted based on the alternative strategies; the model parameters were based on field investigations. Five probability levels were considered in the model: qi = 0.01, 0.25, 0.50. 0.90, and 0.99. The model results showed that the total optimized costs were between US$[55,710.86,80,691.81] × 104 and US$[72,151.39,101,338.6] × 104 under different probability levels. The model results indicate that soil erosion treatment, nonpoint source control measures, and rural waste treatment have much higher costs than other strategies, and our findings indicate that the ICCLP model can effectively deal with optimal water pollution management under uncertainty at the watershed scale.
AB - An inexact chance-constrained linear programming (ICCLP) model for optimal water pollution management at the watershed scale was developed. We selected the net expenditures of the alternative strategies, including initial capital investment and operating costs, as the objectives of water pollution management. The total environmental capacity of the water bodies at different probability levels (qi) was considered a key constraint; other constraints included in the model were government minimum requirements on farmland area, land cover, treatment rate of domestic wastewater and rural wastes, and certain technical constraints. The ICCLP model was applied to Lake Qionghai watershed in China for water quality improvement with the goal of achieving a minimum total cost. Alternative strategies were incorporated following discussions with shareholders and experts. A three-period optimization was conducted based on the alternative strategies; the model parameters were based on field investigations. Five probability levels were considered in the model: qi = 0.01, 0.25, 0.50. 0.90, and 0.99. The model results showed that the total optimized costs were between US$[55,710.86,80,691.81] × 104 and US$[72,151.39,101,338.6] × 104 under different probability levels. The model results indicate that soil erosion treatment, nonpoint source control measures, and rural waste treatment have much higher costs than other strategies, and our findings indicate that the ICCLP model can effectively deal with optimal water pollution management under uncertainty at the watershed scale.
KW - China
KW - Computer programming
KW - Lakes
KW - Optimization
KW - Uncertainty principles
KW - Water pollution
KW - Watershed management
UR - https://www.scopus.com/pages/publications/45849099442
U2 - 10.1061/(ASCE)0733-9496(2008)134:4(347)
DO - 10.1061/(ASCE)0733-9496(2008)134:4(347)
M3 - Article
AN - SCOPUS:45849099442
SN - 0733-9496
VL - 134
SP - 347
EP - 356
JO - Journal of Water Resources Planning and Management - ASCE
JF - Journal of Water Resources Planning and Management - ASCE
IS - 4
ER -