跳到主要导航 跳到搜索 跳到主要内容

Fixed-Time Impact Time Control Guidance Law for Missiles With Input Saturation Constraints Against Maneuvering Targets

  • Beijing Institute of Technology
  • Peking University

科研成果: 书/报告/会议事项章节会议稿件同行评审

摘要

This paper is concerned with the fixed-time impact time control guidance (ITCG) problem against maneuvering targets. Firstly, the fixed-time observers are adopted to estimate the maneuvering target's unknown acceleration. Then, a fixed-time ITCG law is derived by resorting to the time-to-go of deviated pursuit guidance, where the unknown target acceleration is compensated based on the estimates obtained from the fixed-time observers. Moreover, an auxiliary system is adopted to tackle the frequently encountered input saturation constraints, and the fixed-time stability of the proposed ITCG law is analyzed. Finally, simulation results are provided to demonstrate the designed ITCG law.

源语言英语
主期刊名Proceedings - 2023 38th Youth Academic Annual Conference of Chinese Association of Automation, YAC 2023
出版商Institute of Electrical and Electronics Engineers Inc.
780-785
页数6
ISBN(电子版)9798350303636
DOI
出版状态已出版 - 2023
活动38th Youth Academic Annual Conference of Chinese Association of Automation, YAC 2023 - Hefei, 中国
期限: 27 8月 202329 8月 2023

出版系列

姓名Proceedings - 2023 38th Youth Academic Annual Conference of Chinese Association of Automation, YAC 2023

会议

会议38th Youth Academic Annual Conference of Chinese Association of Automation, YAC 2023
国家/地区中国
Hefei
时期27/08/2329/08/23

指纹

探究 'Fixed-Time Impact Time Control Guidance Law for Missiles With Input Saturation Constraints Against Maneuvering Targets' 的科研主题。它们共同构成独一无二的指纹。

引用此