摘要
For the problems of the difficulty in quantifying qualitative indexes in project evaluation and the failure of consistency test caused by too many indexes in AHP, a comprehensive evaluation model based on the group chain fuzzy comprehensive evaluation method is presented. Firstly, the evaluation index system is established and the group chain structure weight method is adopted to calculate the weights of all indicators. Then, the multi-hierarchy fuzzy evaluation method is used to make a quantitative fuzzy comprehensive evaluation so as to integrate the qualitative judgment of all the experts. Finally, the group chain fuzzy comprehensive method is used to evaluate one key science and technology project which is the satellite automatic tracking system project, and the feasibility of the method is shown by this case.
| 源语言 | 英语 |
|---|---|
| 主期刊名 | Proceeding of 2012 International Conference on Information Management, Innovation Management and Industrial Engineering, ICIII 2012 |
| 页 | 389-392 |
| 页数 | 4 |
| 出版状态 | 已出版 - 2012 |
| 活动 | 2012 International Conference on Information Management, Innovation Management and Industrial Engineering, ICIII 2012 - Sanya, 中国 期限: 20 10月 2012 → 21 10月 2012 |
出版系列
| 姓名 | Proceeding of 2012 International Conference on Information Management, Innovation Management and Industrial Engineering, ICIII 2012 |
|---|---|
| 卷 | 3 |
会议
| 会议 | 2012 International Conference on Information Management, Innovation Management and Industrial Engineering, ICIII 2012 |
|---|---|
| 国家/地区 | 中国 |
| 市 | Sanya |
| 时期 | 20/10/12 → 21/10/12 |
联合国可持续发展目标
此成果有助于实现下列可持续发展目标:
-
可持续发展目标 9 产业、创新和基础设施
指纹
探究 'Choosing project evaluation of the key science and technology project based on group chain fuzzy comprehensive method' 的科研主题。它们共同构成独一无二的指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver