跳到主要导航 跳到搜索 跳到主要内容

An integrated model for multi-resource constrained scheduling problem considering multi-product and resource-sharing

  • Changchun Liu
  • , Xi Xiang
  • , Li Zheng*
  • , Jing Ma
  • *此作品的通讯作者

科研成果: 期刊稿件文章同行评审

摘要

This paper studies a multi-resource constrained scheduling problem considering multi-product and resource-sharing in the manufacturing supply chain, in which many independent production units coordinate with a truck resource manager. A mixed integer programming model is formulated to minimise the total system cost and some analytical properties are proposed to tighten the model. A Lagrangian relaxation-based heuristic with several enhancements, e.g. warm startup, approximating solve and parallel computation of subproblems, is proposed to solve the model. Finally, computational experiments are conducted to verify that (i) the proposed method has a better performance in both objective and CPU time than CPLEX, (ii) all three enhancements can help reduce the total computation time and (iii) a certain degree of resource-sharing can help reduce the total cost of the system.

源语言英语
页(从-至)6491-6511
页数21
期刊International Journal of Production Research
56
19
DOI
出版状态已出版 - 2 10月 2018
已对外发布

指纹

探究 'An integrated model for multi-resource constrained scheduling problem considering multi-product and resource-sharing' 的科研主题。它们共同构成独一无二的指纹。

引用此