跳到主要导航 跳到搜索 跳到主要内容

An Improved Grey Wolf Optimizer for Flexible Job-shop Scheduling Problem

  • Ye Jieran
  • , Wang Aimin
  • , Ge Yan
  • , Shen Xinyi
  • Department Institute of Technology
  • Beijing Institute of Technology

科研成果: 书/报告/会议事项章节 › 会议稿件 › 同行评审

摘要

For the flexible job-shop scheduling problem, an optimal scheduling model with the objective of minimum completion time is established, and an improved grey wolf optimizer is proposed. The algorithm improves the coding method based on Largest Order Value rule of the grey wolf optimizer. At the same time, a local search strategy is introduced to effectively balance the exploration ability and development ability of the algorithm. Finally, experiments verify the effectiveness of the algorithm.

源语言英语
主期刊名Proceedings of 2020 IEEE 11th International Conference on Mechanical and Intelligent Manufacturing Technologies, ICMIMT 2020
出版商Institute of Electrical and Electronics Engineers Inc.
页213-217
页数5
ISBN(电子版)9781728153322
DOI
出版状态已出版 - 1月 2020
已对外发布是
活动11th IEEE International Conference on Mechanical and Intelligent Manufacturing Technologies, ICMIMT 2020 - Cape Town, 南非
期限: 20 1月 2020 → 22 1月 2020

丛书

姓名Proceedings of 2020 IEEE 11th International Conference on Mechanical and Intelligent Manufacturing Technologies, ICMIMT 2020

会议

会议11th IEEE International Conference on Mechanical and Intelligent Manufacturing Technologies, ICMIMT 2020
国家/地区南非
市Cape Town
时期20/01/20 → 22/01/20

学术指纹

探究 'An Improved Grey Wolf Optimizer for Flexible Job-shop Scheduling Problem' 的科研主题。它们共同构成独一无二的学术指纹。

引用此