跳到主要导航 跳到搜索 跳到主要内容

A cooperative scheduling model for subway trains

  • Xiang Li
  • , Xin Yang
  • , Hongwei Wang
  • , Shuai Su
  • , Wenzhe Sun
  • Beijing Jiaotong University

科研成果: 书/报告/会议事项章节 › 会议稿件 › 同行评审

摘要

For subway systems, the energy put into accelerating the trains can be reconverted into electric energy by using the motors as generators during braking phase. Generally speaking, except a small part is used for on-board purposes, most of the recovery energy is transmitted backwards along the conversion chain and fed back into the catenary. However, since the low catenary voltage DC systems, the transmission losses are very high. In order to improve the utilization of recovery energy, this paper proposes an optimization approach to cooperate the acceleration and brake times of successive trains such that the recovery energy from the braking train can be directly used by the accelerating train. First, we formulate a quadratic programming model to optimize the cooperative degree with trip time constraint and time window constraints. Furthermore, we solve the optimal solution by using the Kuhn-Tucker conditions. Finally, we present a numerical example based on the operation data from Beijing Yizhuang subway line of China, which illustrates that the proposed model can improve the cooperative degree by 9.08%.

源语言英语
主期刊名2012 Joint Rail Conference, JRC 2012
出版商American Society of Mechanical Engineers (ASME)
页729-734
页数6
ISBN(印刷版)9780791844656
DOI
出版状态已出版 - 2012
已对外发布是
活动2012 Joint Rail Conference, JRC 2012 - Philadelphia, PA, 美国
期限: 17 4月 2012 → 19 4月 2012

丛书

姓名2012 Joint Rail Conference, JRC 2012

会议

会议2012 Joint Rail Conference, JRC 2012
国家/地区美国
市Philadelphia, PA
时期17/04/12 → 19/04/12

学术指纹

探究 'A cooperative scheduling model for subway trains' 的科研主题。它们共同构成独一无二的学术指纹。

引用此